On Sunday we went back to Harlaw/Threepmuir (see two weeks ago's post) to finish off the wall rebuild. When I arrived, Dave and Alan had already made a start on completing the 'through' course. It seemed to go a lot easier than the last time, probably because we'd already dealt with the worst of what was there before. After a couple of hours' work we only had the copes left to put on, so we stopped for an early lunch and then put up the copes. Some had gone astray somehow, and we didn't have any other suitably sized stone so we had to improvise a bit, but I think we got away with it. We still had most of the afternoon left to us, and there are plenty of other bits of the wall in need of attention, but in the light of this repair having grown from a couple of meters' gap to about three times that once we'd started on it we didn't think we had time to tackle them, so we just called it a day at that.
0 Comments
Leave a Reply. |
AuthorThis blog, and the rest of the site, are produced by Donald McInnes, treasurer of the SES DSWA (I'm the baldy one, sometimes in a saltire hat). Archives
July 2024
Categories |